It has been a long, and bumpy road but, at long last, our SkyShed POD-S observatory structure is arriving! Delivery is set for tomorrow, July 10, via freight truck. Wrangling the large and heavy parts of the RTA (ready-to-assemble) building from street to site will be challenging but I think / I hope I can manage it. One looming problem: once put together, hoisting the assembled dome to rest upon the round base wall is a task that I’m uncertain how we’ll accomplish — the thing will weigh 350 pounds! I’ll need several strong people to help lift the dome but don’t know where they’ll come from.
In the mean time, I’ve assembled a collection of tools and materials required for the assembly, the building permit is in place, and so we forge ahead.
